How to care for your new blacktop driveway.
- We ask that you keep car traffic off your driveway for at least 3 days.
If temperatures are real hot we ask that you try not to park on your drive
for up to 5 days. You may walk on your drive right away.
- Your driveway will need 6-12 months to harden and cure. It will remain soft
and pliable until then. Even after it has cured it will not be as hard as
concrete. Your driveway will soften and harden as temperatures rise and fall.
Please be aware of this in hot temperatures. If you wish, you may water down
your drive with a hose on hot days to temporarily harden the drive.
Spot damage may occur on your drive if cars start out or stop too fast. This
also may happen if you turn your steering wheel when the car is not moving.
- To prevent pits, holes or gouges in your drive avoid using lawn chairs or
kickstands on your drive. They exert weight on concentrated areas and will
mar your drive. When using car jacks, ramps or storing boats or campers, place
a piece of plywood under them to help distribute the weight.
- Large heavy trucks will depress your new blacktop. Keep concrete and other
heavy trucks off your new driveway.
- Avoid driving off the edges of your driveway. They will crack and crumble
due to lack of side support. You may support the sides by building up the
edges with topsoil. But please do not do this until after the driveway has
cured. (6-12 months)
- You must keep dirt off the asphalt surface at all times. The dirt pulls
the oils out of the blacktop.
- It is natural for the texture of your driveway surface to be varied. It
is caused by the various sizes of sand, stone and other ingredients that make
up asphalt. Also, areas that are done by hand will appear different than those
done by machine.
- Gasoline, Oil, Anti-freeze, transmission and power steering fluid will soften
and break up your driveway. These should be professionally repaired.
- Cracks may develop over the winter due to the contraction and expansion
of the ground. These should be filled with crack filler.
- If you wish you may seal your driveway with a Coal tar sealer, but we recommend
that you wait at least 1 year. Sealer will protect your driveway if you have
any gas or oil spills and will give your drive that new black look.
Call Gavers Pavers at 262-642-3100 to schedule your new blacktop driveway.